The client had instructed us to fix their faulty outside lights to both the front and rear gardens.

Following a thorough inspection and test of the installation, it was found that the previous installation method had failed completely and significant re wiring would have to take place.

We installed new cabling and relevant IP rated junction boxes and fittings to both the font and rears garden. Marine grade fittings were used owing to the close proximity to the sea.

A mixture of 12v and 240v fittings were installed and were controlled via numerous wisebox controls.

The installation was inspected, tested and certificated.

Client:
Mr & Mrs Redknapp

Task:
Domestic Installation

Timeline:
Over 2 months