Alongside the print factory installation we carried out three complete office installations

These offices would be sub let with the client utilising the ground floor one.

Each office had its own consumer unit and was sub metered.

A kitchenette and toilet facility was also provided per office.

A zoned fire alarm system was installed to the building and this was linked to the main factories.

All power, lighting, data was installed and later adapted to the tenants needs.

Client:
Bournemouth Colour Press Office

Task:
Commercial Offices

Timeline:
4 months